ExxonMobil Starts Production at Uaru, Lifting Guyana Capacity to 1.1 Million Barrels per Day

SentiSense · Published · Updated

ExxonMobil started production at Uaru, the fifth development in Guyana's Stabroek block, raising the country's installed production capacity to 1.1 million barrels per day. The Errea Wittu FPSO has capacity of 250,000 barrels per day, and the startup follows last week's $12.5 billion investment decision on the Longtail gas project.

XOM announced on Nov. 16 that its Guyana affiliate has started production at Uaru, the fifth development in the offshore Stabroek block. The Errea Wittu floating production, storage and offloading vessel has capacity of 250,000 barrels per day, and its startup raises Guyana's installed production capacity to 1.1 million barrels per day.

Before Uaru, ExxonMobil was producing around 900,000 barrels of oil per day from four Stabroek projects. Two more oil developments, Whiptail and Hammerhead, are scheduled to begin production in 2027 and 2029.

The startup comes days after ExxonMobil made a final investment decision on Longtail, the eighth Stabroek development, a $12.5 billion project targeting non-associated gas and condensate. Longtail's FPSO is designed to process 1.2 billion standard cubic feet of gas per day and produce up to 250,000 barrels of condensate, with about 45 subsea wells and first production expected in 2030.

Guyana sits alongside the Permian Basin as one of ExxonMobil's main volume growth engines. The near-term watch item is how quickly Uaru ramps toward its nameplate capacity, which will show up in fourth-quarter and 2027 upstream volumes.

Related Stocks

Powered by SentiSense - Intelligent Market Analysis